Merged revision, October 22, 2026: this article incorporates the stage-clock, failure-recovery, and connection-lifecycle cases from the former "Don't Let a Fallback Answer Pretend to Succeed." The old fixed-planner architecture is discussed only as historical context. The Run-termination authority consolidation completed scoped provider-free verification and archival on October 19, 2026; it is not proof of real-model research quality or production deployment acceptance.

A research task has read several sources, completed part of its computation, and delivered a few passages to the user. Should a single failed tool, changed optional suggestion, or disconnected browser terminate the entire investigation?

Simply propagating exceptions upward often gives the earliest failing module the power to terminate a Run. A component responsible for one read or suggestion inadvertently acquires authority over the entire task.

The opposite failure is equally dangerous: to avoid a visible failure, a system silently switches to an easier question and marks a fluent but irrelevant answer completed.

The two problems need one coherent response: a local failure must not arbitrarily terminate independent work, and recovery must not change the task, expand authorization, or relabel unknown effects as successful.

This is not primarily about adding retries. It is about assigning authority over local operations, the Run lifecycle, and final delivery to their rightful Owners.

1. Control over Published Text Is Not Run Termination Authority ​

The Publication system handles candidate text, previews, versioned commits, and revisions. Whether a particular passage is eligible for display is a different effect from whether the wider research Run may continue.

A tool can reject an unauthorized invocation. A search service can refuse a search that exceeds its quota. Context compaction can discard a summary whose identity no longer matches. All of these may be correct local decisions.

But do they prove that other authorized sources, tools, and already-committed passages must stop? Usually not.

A veto is identified by its effect, not its spelling. A throw, filtering operation, early return, or failure to show an authorized tool to the model can all behave as vetoes.

Original OwnerFacts it may establishWhat those facts do not automatically establish
Tool, source, or execution OwnerOne operation was denied, failed, succeeded, or had an unknown effectThe whole research task failed
Resource OwnerAdmission, usage, and remaining capacity for its resourceEvery other resource is depleted, or the user's task is complete
PublicationWhether text is displayed or committed, and at which versionThe user's question was answered correctly
Run LifecycleContinue, recover, finalize, or terminate based on original factsNew authorization, rewritten receipts, or certification of answer quality

One effect should have one final Owner, but distinct effects still require distinct boundaries. Putting every decision inside a grand "trust manager" is not inherently safer.

2. How Optional Information Became a Second Judge ​

We once used model-maintained Research Needs: a list of questions still requiring work. It helped organize research. It did not own source permissions, and its contents could not prove that a question had been resolved.

In an early Main request path, just before dispatch, we checked whether the Needs list had changed:

typescript
// Historical branch; no longer a present dispatch decision.
if (JSON.stringify(fittedState) !== JSON.stringify(currentNeeds)) {
  throw new Error("Research needs changed before provider dispatch");
}

The intent was to prevent request/state inconsistency. The effect was to allow an optional worklist to block an entire valid model request.

Reviewer suggestions exposed a similar problem. The preparation phase already bound a suggestion to Child terminal state, Run authorization, and actual request identity. Reinterpreting the original Reviewer material immediately before dispatch could then veto a suggestion that had already been legally sealed.

The redundant post-Reviewer check was removed before the Run-termination consolidation. Later, optional Needs failures were separated from actual dispatch authority. Request identity, user corrections, tool contracts, and execution fencing remain valid protections; what disappeared was an optional list's shadow authority over Main dispatch.

Stop Hook had another form of veto. Main proposed a legitimate completion, but a Stop response of continue could historically turn it into block and force another model turn.

The current contract treats Stop as advice, not an independent right to veto valid completion or compel extra requests. Explicit user cancellation, real permission restrictions, and objective budget limits still apply through their original Owners.

This change did not remove the no-progress rule. If there is neither publishable text nor a valid tool call, the Run still ends in a bounded way and reports that no answer was generated. Removing the Stop veto does not convert an empty response into success.

The question is therefore not "should we delete consistency checks?" It is which effect does this check protect, and is it entitled to block the main flow?

3. One Budget Fact Should Not Have Two Ledgers ​

A Run can be limited by requests, tools, time, concurrency, and reserved final-output capacity. Multiple distinct constraints are normal. Two independent authorities making decisions about the same consumption create conflicts.

The original Root Resource owns atomic admission and actual usage facts for shared requests. Runtime consumes the resource view, selects stages, and produces warnings; it does not issue or revoke request eligibility from an independent shadow ledger.

A focused effort on October 18, 2026 passed 279 targeted checks; another 88 checks for the original Root Owner passed separately. Those test selections have different scopes and must not be added together as a count of independent scenarios.

Web-search quotas, Provider physical concurrency, and text-revision counts may still belong to different modules because they constrain distinct resources.

Exhausting search capacity forbids new searches, not automatically the consumption of already-obtained results. Whether reading remains available depends on reading's own constraints and shared resources. Exhausting ordinary research capacity also does not erase a previously reserved final-output allowance.

Retries draw from the original remaining budget. If planning, tooling, and continuation each independently grant "two retries," nested retry loops inflate total consumption. Read-only requests still occupy paid tokens, leases, and upstream capacity; they are not free simply because they do not mutate a database.

For the detailed resource contract, see Run Budget and Constraint Governance.

4. Identify the Clock Before Calling Something a Timeout ​

Two cases from the former failure article remain particularly instructive.

One inspected run took roughly 360 seconds as seen from the page: approximately 347 seconds in a queue and 13 seconds of actual execution. The execution itself finished normally.

Another combined query appeared as a "network error" in the page, even though the tool succeeded in roughly 0.15–0.29 seconds. Failure occurred after the tool result, during a second model-continuation round. Approximately 30 seconds elapsed without answer text.

Both belong to historical controlled-development windows, not current performance baselines. They illustrate why wall-clock duration is not synonymous with execution timeout, and why tool success is not equivalent to successful continuation.

ClockStart pointWhat it primarily explains
Queue timeEntry into the scheduling queueCapacity and concurrency delay
Stage execution timeWhen the stage actually gains executionModel, tool, and validator time
No-progress timeLast meaningful business progressWhether a stage is still producing useful work
Overall deadlineStart of the business RunRemaining time for the original task

Transport heartbeats, usage events, and internal reasoning chunks prove only transport activity; they must not automatically reset a business-progress clock. Stage time budgets are also bounded by the remaining overall deadline. Otherwise every stage can be "legitimately waiting" while the whole request has no finite endpoint.

Recovery depends on the actual failure point. If the tool succeeded and only model continuation failed, preserve the tool receipt and consider resuming downstream work under the original constraints. A browser error is not a reason to execute the whole tool chain again.

If headers arrived and the body was interrupted without definitive deadline evidence, the state should remain interrupted or unknown, not be relabeled "timeout" on intuition alone.

See the dedicated failure-diagnosis essay for more detailed failure identities.

5. What the Old Planner Taught Us: Never Change the Question to Claim Success ​

One historical fixed-planner validation set contained 48 records. Across eight Runs, ten planning invocations generated internal reasoning but no legal plan body, eventually hitting the stage deadline. The old recovery path then constructed a generic-knowledge task, dropping the original entity, time, and evidence requirements. One request accumulated repeated planning and queuing for roughly 672 seconds end to end.

The essential failure was not the wait. The user asked for a current, evidenced fact; the fallback answered a general conceptual question and called it complete. Similar topic, different completion condition.

At the time, the fix introduced planning_failed and negative tests proving that a failed plan would not silently enter later tool, answer, or review stages.

That is a historical repair of the old planning architecture, not a present-day requirement for every Research Run to produce a formal valid plan. Today the model selects its path through a native tool loop; Runtime maintains actual authorization, execution, and publication facts.

The lasting principle is that a degraded answer may reduce what it claims, but must not silently replace what the user asked. When current market evidence is unavailable, retain confirmed parts and explain the gap; don't present timeless generalities as current quotes.

Plan validity, evidence coverage, body persistence, semantic quality, and user receipt cannot be compressed into a single PlanValid formula.

6. Deepen the Existing Lifecycle Instead of Inventing a Termination Agent ​

We did not add a new "termination Agent" or funnel module-selected failed outcomes through a shared exception formatter. Centralized formatting would not actually reclaim termination authority.

The existing Run Lifecycle receives facts established by the original local Owners and selects an allowed continue, recover, finalize, or settle path.

Main still owns research selection and synthesis. Recovery preserves leases, fencing, and receipts. Resource Owners make admission decisions. Publication decides the treatment of published text.

正在绘制架构图…

A failure that can be handled locally stays local. When escalation is required, the lifecycle chooses among currently authorized operations, not just abstract success/failure labels.

Actual statePossible next pathConstraint that must remain
One ordinary tool fails but other independent evidence and tools remainContinue authorized researchDo not reclassify the failure as a successful empty result
Temporary Provider failure with original recovery conditions and budget intactBounded recovery within the existing mechanismDo not manufacture more budget or change task identity
Ordinary research cannot continue but the original output reserve remains validOne-way transition to finalization-onlyUse existing eligible material; disclose unfinished scope
Explicit user cancellation, overall hard limit, or failed protective identityStop and settle according to original factsDo not dispatch more work in the name of elegance
External effect remains unknownAsk the original execution/Recovery Owner to reconcileDo not replay blindly or mark it successful prematurely

Finalization reuses the original output channel. It is not a new fallback system. It may only use existing accepted resources and permissions, and cannot bounce back into ordinary research to obtain another round of finalization capacity after failing.

There is a family resemblance to Microsoft's Bulkhead pattern: isolate the impact of a local failure. Here that does not imply creating a thread pool for every module. We are consolidating authority within a single Runtime so a refusal for one effect does not automatically veto independent effects.

7. Recovery Must Preserve the Task and Admit Unknown Effects ​

Eligibility for recovery must check at least the original task identity, an available checkpoint, the same Run Grant, remaining budgets, and whether the original execution can safely resume. A label saying "temporary error" is not enough.

AWS Builders' Library on making retries safe with idempotent APIs illustrates the same fundamental issue: no received response does not mean the server performed no effect.

An Agent facing tool timeout or a lost database-commit acknowledgment cannot conclude that nothing happened. Original request identity and receipts govern replay; the model asking to "try again" is not execution evidence.

Several boundaries must hold together:

  • Do not re-invent effects that already occurred. Read committed tool results and text under their original identities. A previewed candidate is not a persisted artifact; a summary cannot recreate a nonexistent original.
  • Do not regrant permissions within the same Run. Recovery inherits recorded authorization. It does not re-adjudicate the existing Run from today's permission table. Original account, scope, content identity, cancellation, and resource boundaries still apply; a new Run undergoes fresh admission.
  • Do not reset shared resources. Retries, continuations, and Recovery consume the original balances rather than minting new allowances.
  • Do not replay an unknown external effect automatically. The original execution and Recovery evidence—not a timeout label, "read-only" tag, or user expectation—determine safety.
  • Do not rewrite the user's goal on continuation. Narrow claims and disclose missing evidence when needed. A new user correction must be accepted by the current work, not presumed to have propagated through an old summary.

These limits make failures explainable. They do not promise every failure can be recovered or create a bypass for Runs whose identity or persistence preconditions no longer hold.

8. Disconnected Client, Settled Run, and User Receipt Are Different Facts ​

The browser connection is an observation channel. The Run is a business execution.

An ordinary disconnect detaches a subscription; an explicit user stop is a cancellation intent. Those are not interchangeable. Reconnecting must not silently launch new research.

正在绘制架构图…

Detached means a connection left, not that the Run received renewed permission. Settled retains the true complete, partial, failed, or canceled outcome; it does not certify research quality. Reconnection reads original events and commits, not a convenient rewritten success.

Research that genuinely resumes after a terminal state requires a causally linked new Run with independent admission.

Even a uniquely recorded terminal state on the server cannot prove that the browser received every passage. Distinguish candidate generation, server commit, transport send, and client observation.

If background persistence ultimately records only partial, the public outcome and completion callback must not keep an earlier complete classification. But proof that the client received all text requires its own delivery evidence.

Chunked text and file delivery have the same separation. Failure of chunk two does not erase chunk one; the existence of chunk one does not prove the entire question was answered. Saving an article body does not prove that an attachment was saved or downloaded. Publication and file Owners retain their respective mechanisms; Run Lifecycle should not recreate their validators.

9. What Was Verified, and What Still Needs Separate Evidence ​

Run-termination authority consolidation was implemented, aligned with accepted specs, and archived on October 19, 2026.

The selected verification covered shared termination decisions, recovery and bounded finalization through existing mechanisms, isolation of optional Needs, advisory Stop, and consistency between durable state and completion callbacks.

The evidence used a production Factory, a scripted model gateway, and fresh-pool replay against an independent PostgreSQL instance:

  • 312 targeted tests across 14 files passed.
  • One targeted PostgreSQL check passed.
  • Root type checking passed.
  • The provider-free formal closure receipt was complete.

These different checks are not combined into a fictional whole-repository quality score. Translating this article does not mean those original tests were run again.

The results support a scoped control contract. They do not prove the whole codebase has no failures, that natural models always finish investment research, that every browser scenario is stable, or that the feature is deployed.

The older 360-second and 672-second observations belong to their distinct historical windows, not to this same acceptance sample.

Meaningful acceptance examines the original chain: can independent legal work continue after a local failure? Can Stop force an extra turn? Can an unknown effect be repeated? Do Publication settlement and completion callbacks agree?

We need evidence for both sides: justified rejections still happen, and independent authorized work is not incorrectly stopped.

10. Before Merging Code, Ask Who Owns the Refusal ​

Our review questions now boil down to three:

  1. Does this module own the final decision over the effect?
  2. Does its rejection affect only that effect?
  3. Is it reinterpreting a fact already recorded by another Owner?

This echoes John Ousterhout's writing on modular design and information hiding: useful modularity prevents callers from having to reproduce a module's internal decision. Merely placing exception handling in one large function while allowing callers to independently select terminal states does not consolidate responsibility.

Reliable execution does not mean returning polished prose every time. It means preserving effects that really occurred, continuing what is still legal under the original permissions and resources, and settling honestly when continuation is impossible.

A module can say its own operation must stop. Whether the entire research task can continue belongs to the lifecycle that knows the original execution facts and recovery conditions.

Further Reading and Discussion ​